ACE Water Transmission Main, Ph 7, Contract 22
This project, sponsored by the Alberta Central East (ACE) Water Corporation, comprised the installation of water transmission line from Paradise Valley to Range Road 24, comprising 17 kms of directionally drilled line and associated residential service connections. Construction particulars included
- Project start up activities; contract execution, submittals (ECO/ESC Plan, TAS, Schedule, Shop Drawings), and procurement
- Horizontal directionally drilled 100mm (17.17 kms) with 200mm casing (910m)
- Service materials; blow-offs (12), gate valves and air releases (16)
- Pig launching/retrieval stations (2)
- Connection to the existing infrastructure and preparation for the subsequent contract tie-in
- Site restoration (15,000 m2)